top of page

REFERÊNCIAS BIBLIOGRÁFICAS

[1]       H.M. Khodr, J.F. Gómez, L. Barnique, J.H. Vivas, P. Paiva, J.M. Yusta, and A.J. Urdaneta, “A linear programming methodology for the optimization of electric power-generation schemes,” IEEE Trans. Power Syst., vol. 17, no. 3, pp. 864–869, 2002.

[2]       C. Krane and H.J. Haubrich, “Evaluation of the network structure of electrical transmission networks,” 2008 Third Int. Conf. Electr. Util. Deregul. Restruct. Power Technol., no. April, pp. 815–819, 2008.

[3]       H.S. H. Sun and B.Z. B. Zhang, “Distributed power flow calculation for whole networks including transmission and distribution,” 2008 IEEE/PES Transm. Distrib. Conf. Expo., pp. 1–6, 2008.

[4]       D. Karlsson and M. Kockott, “Advanced Oltc Control To Counteract Power System Voltage Instability,” ABB Power Technol. Autom., no. 2006, pp. 1–8.

[5]       F.M.T.C. Gil, “Detecção de Defeitos em Redes de Distribuição Secundária,” Faculdade de Engenharia da Universidade do Porto, 2009.

[6]       P. Gerardo e M. Fernandes, “Modelização e análise de desempenho de redes de distribuição mistas,” 2012.

[7]       D.M.B. Matos and J.P.S. Catalão, “Geração Distribuída e os seus Impactes no Funcionamento da Rede Elétrica : Parte 1,” pp. 7–12, 2013.

[8]       M. Beaudin, H. Zareipour, A. Schellenberglabe, and W. Rosehart, “Energy storage for mitigating the variability of renewable electricity sources: An updated review,” Energy Sustain. Dev., vol. 14, no. 4, pp. 302–314, 2010.

[9]       A.P.V.Calderaro, V. Galdi, F. Lamberti, “Coordinated local reactive power control in smart distribution grids for voltage regulation using sensitivity method to maximize active power,” 2013.

[10]     A.G. Madureira and J.A.Peças Lopes, “Voltage and reactive power control in MV networks integrating microgrids,” Proc. ICREPQ, vol. 7, 2007.

[11]     J. Driesen, “The influence of the connection technology of dispersed energy sources on grid stability,” pp. 0–3, 2004.

[12]     H. Jiayi, J. Chuanwen, and X. Rong, “A review on distributed energy resources and MicroGrid,” Renew. Sustain. Energy Rev., vol. 12, no. 9, pp. 2465–2476, 2008.

[13]     D.S.E. Elétrica, “Guia de Aplicação das Condições Técnicas de Ligação às Redes de Distribuição das Instalações de Produção de Energia Elétrica em Regime Especial”, 2002.

[14]     GEPOC. "Eletrônica de Potência", Universidade Federal de Santa Maria - UFSM, 2001-2012, disponível em: http://coral.ufsm.br/gepocufsm/index.php/areas-de-atuacao/menu-eletronica-de-potencia [Acedido: Agosto 2015]

[15]     J.A. Momoh, “Smart grid design for efficient and flexible power networks operation and control,” 2009 IEEE/PES Power Syst. Conf. Expo., pp. 1–8, 2009.

[16]     R.E. Brown, “Impact of Smart Grid on Distribution System design,” IEEE Power Energy Soc. 2008 Gen. Meet. Convers. Deliv. Electr. Energy 21st Century, PES, 2008.

[17]     M.E. Elkhatib and M.H. Ahmed, “Optimal Real-Time Coordinated Voltage and Reactive Power Control in Smart Grids,” pp. 1–6, 2014.

[18]     X. Lou, D.K.Y. Yau, H.H. Nguyen, and B. Chen, “Profit-optimal and stability-aware load curtailment in smart grids,” IEEE Trans. Smart Grid, vol. 4, no. 3, pp. 1411–1420, 2013.

[19]     E. Lannoye, D. Flynn, and M. O’Malley, “The role of power system flexibility in generation planning,” IEEE Power Energy Soc. Gen. Meet., 2011.

[20]     D. Kirschen and Y. Rebours, “What is spinning reserve ?,” Framework, pp. 1–11, 2005.

[21]     R. Bessa, C. Moreira, B. Silva, and M. Matos, “Handling renewable energy variability and uncertainty in power systems operation,” Wiley Interdiscip. Rev. Energy Environ., vol. 3, no. 2, pp. 156–178, 2014.

[22]     F. Manuel e M. Moreira, “Caracterização da Variabilidade da Produção Renovável e da Flexibilidade da Produção Convencional,” 2014.

[23]     M.A. Ortega-Vazquez and D.S. Kirschen, “Should the spinning reserve procurement in systems with wind power generation be deterministic or probabilistic?,” Sustain. Power Gener. Supply, 2009. SUPERGEN ’09. Int. Conf., pp. 1–9, 2009.

[24]     A. Ulbig and G. Andersson, “Analyzing Operational Flexibility of Electric Power Systems,” arXiv Prepr., p. arXiv:1312.7618v2, 2014.

[25]     A. Brooks, E. Lu, D. Reicher, C. Spirakis, and B. Weihl, “Demand dispatch,” IEEE Power Energy Mag., vol. 8, no. 3, pp. 20–29, 2010.

[26]     E. Ela, B. Kirby, E. Lannoye, M. Milligan, D. Flynn, B. Zavadil, and M. O’Malley, “Operating Reserve Determination Evolution in Wind Power Integration Studies,” Power Energy Soc. Gen. Meet. 2010, no. March 2011, pp. 1–8, 2010.

[27]     B.K. Sovacool and R.F. Hirsh, “Beyond batteries: An examination of the benefits and barriers to plug-in hybrid electric vehicles (PHEVs) and a vehicle-to-grid (V2G) transition,” Energy Policy, vol. 37, no. 3, pp. 1095–1103, 2009.

 

bottom of page